Tenoil Early Production System, Nigeria

Tenoil Fast-Track Production Solution

Rapid EPCI Delivery

Project Overview: HBA Future Energy demonstrated exceptional fast-track execution capabilities by delivering a complete early production system for Tenoil in just two months.

Achievement: Successfully delivered a complete early production system in an expedited two-month timeframe, enabling rapid field development.

  • Client: Tenoil
  • Duration: 2 months (2022)
  • Services: Early production EPCI
  • Status: Completed
  • Complete EPIC contract
  • Transportation & Installation (T&I)
  • Geotechnical analysis
  • Fast-track design & build

DP3 Floatel & Heavy Lift Services, Indonesia

DP3

DP3 Floatel Accommodation Services, Indonesia

Offshore Accommodation and Engineering Support

Project Overview: HBA Future Energy delivered comprehensive DP3 floatel accommodation services for ENI, housing over 500 personnel while providing engineering support for critical offshore operations.

Operational Achievement: Successfully accommodated over 500 personnel while maintaining continuous engineering support for complex offshore installation activities over 22 months.

  • Client: ENI
  • Vessels: 2 x 250 BP AHTS vessels
  • Water Depth: 1,200 meters
  • Service Duration: 1,050 cumulated charter days
  • Service Type: Rig mooring support

Deep water anchor handling operations in challenging 1,200m water depths, demonstrating our advanced marine support capabilities.