ANMA Offshore Substation, South Korea

ANMA-OSS

ANMA 532MW Offshore Substation

South Korea’s Commercial Offshore Wind Infrastructure

Project Overview: HBA Future Energy serves as the OSS EPCI contractor for South Korea’s first commercial offshore wind farm at Anma-Do, a project enabling 532 MW of clean energy generation.

National Impact: Powering approximately 1.4 million South Korean homes annually with clean electricity, supporting the nation’s renewable energy transition.

  • Client: Anma Offshore Wind Energy Co., Ltd
  • Location: Anma-Do, South Korea
  • Capacity: 532 MW OSS
  • Annual Output: ~1,400 GWh/year
  • Duration: 2023-2028
  • Status: Agreement signed 2023, COD targeted 2028

Complete EPCI delivery (Engineering, Procurement, Construction, Installation) for the offshore substation, marking South Korea’s entry into commercial-scale offshore wind power.

EMEM FPSO (Okwok), Nigeria

EMEM FPSO (Okwok), Nigeria

Zero-Flaring Offshore Production Facility

Project Overview: HBA Future Energy, together with our partner WCP secured an FPSO lease-and-operate contract with Oriental Energy Resources for the Okwok Field in Nigeria. This project demonstrates our comprehensive FPSO capabilities with environmentally responsible zero-flaring technology.

Our Role: Construction and development of the converted FPSO, targeting sail-away by end-2025, with operations and maintenance services to be provided for a five-year charter period.

  • Client: Oriental Energy Resources
  • Location: Okwok Field, Offshore Nigeria
  • Charter Duration: 5 years
  • Status: Contract awarded 2021
  • Production Capacity: 40,000 barrels per day
  • Zero-flaring design
  • Gas lift system
  • Full lease & operate services

Lakam-Ha FPSO (Armada Claire), Mexico

Armarda-Clarie-FPSO

Lakam-Ha FPSO (Armada Claire) Reactivation

Strategic Asset Redeployment

Project Overview: HBA Future Energy undertakes the reactivation and conversion of the Lakam-Ha FPSO (Armada Claire) for TMS Tankers, demonstrating our vessel conversion and life extension capabilities.

  • Client: Leone Shipholding Inc., (TMS Tankers)
  • Scope: Reactivation, upgrade & conversion for redeployment
  • Timeline: 2023-onwards
  • Status: Under conversion / delivery in progress
  • FPSO reactivation
  • Upgrade and conversion works
  • Life extension program
  • Preparation for redeployment

Jangkrik FPSO Services, Indonesia

Jangkrik Field Support Services

Comprehensive Marine Solutions for ENI Indonesia

Project Overview: HBA Future Energy successfully completed two phases of marine service contracts supporting ENI’s Jangkrik FPSO operations in Indonesia.

Combined Impact: Successfully delivered services supporting ENI’s Indonesian operations, demonstrating our versatility in complex offshore support operations.

  • Duration: 2 years
  • Services: IMR and marine support
  • Equipment Utilised: Standby DSV CREST Odyssey 01
  • Status: Completed
  • Duration: 2 years
  • Services: Deepwater rig movement and debottlenecking
  • Project: Merakes HP/LP gas tie-backs
  • Equipment Utilised: DP3 accommodation workboat
  • Status: Completed

Deep Water Anchor Handling Support, Indonesia

Deep-Water-Anchor

Deep Water AHTS Services, Indonesia

Long-term Anchor Handling Support for IOC Operations

Project Overview: HBA Future Energy provided long-term Anchor Handling Tug Supply (AHTS) services to ENI, supporting deep water drilling operations with specialized vessels.

  • Client: ENI
  • Vessels: 2 x 250 BP AHTS vessels
  • Water Depth: 1,200 meters
  • Service Duration: 1,050 cumulated charter days
  • Service Type: Rig mooring support

Deep water anchor handling operations in challenging 1,200m water depths, demonstrating our advanced marine support capabilities.

Tenoil Early Production System, Nigeria

Tenoil Fast-Track Production Solution

Rapid EPCI Delivery

Project Overview: HBA Future Energy demonstrated exceptional fast-track execution capabilities by delivering a complete early production system for Tenoil in just two months.

Achievement: Successfully delivered a complete early production system in an expedited two-month timeframe, enabling rapid field development.

  • Client: Tenoil
  • Duration: 2 months (2022)
  • Services: Early production EPCI
  • Status: Completed
  • Complete EPIC contract
  • Transportation & Installation (T&I)
  • Geotechnical analysis
  • Fast-track design & build

DP3 Floatel & Heavy Lift Services, Indonesia

DP3

DP3 Floatel Accommodation Services, Indonesia

Offshore Accommodation and Engineering Support

Project Overview: HBA Future Energy delivered comprehensive DP3 floatel accommodation services for ENI, housing over 500 personnel while providing engineering support for critical offshore operations.

Operational Achievement: Successfully accommodated over 500 personnel while maintaining continuous engineering support for complex offshore installation activities over 22 months.

  • Client: ENI
  • Vessels: 2 x 250 BP AHTS vessels
  • Water Depth: 1,200 meters
  • Service Duration: 1,050 cumulated charter days
  • Service Type: Rig mooring support

Deep water anchor handling operations in challenging 1,200m water depths, demonstrating our advanced marine support capabilities.